Page 1 of 2

Northern Pacific progress

Posted: Tue Oct 02, 2018 6:56 pm
by ScaleCraft
Image
Image
Image
Image
Image
Image

Finally yard is in. Switches, track, all screwed down, gaps, no power yet.
Alligator leads for testing.
Actually have a caboose track for the first time ever.
Outer main is not quite done, the last curve is bent, but two switches are set but not installed for accessing engine terminal off main....the 3/4 base has been raised for that area 1/4" and now matches...so close to putting the pit in.

One rubbing contact on the main shaft for three rail power.

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 7:36 pm
by rogruth
Dave,
Good to see moe of your 3R layout. It has been a while. More please.

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 8:50 pm
by E7
Dave,

Lookin' good!

Rich

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 9:03 pm
by De Bruin
Agree, looks great Dave
You gotta love Gargraves, though it sure is a pain to cut.
I think I still have the scars

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 10:51 pm
by ScaleCraft
Pain to cut...sometimes. If I have four inches to whack, tin snips to 1/4"-3/8" then Dremel cutoff wheel to finish.

I am replacing really old..rusty...bad stuff, at least third relay...with this nice stuff I took from Bill's pike for old, plus all the new stuff like this yard.

And, I ain't as nimble as I used to be...takes time.

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 11:00 pm
by Nortonville Phil
Nice layout Dave. Say do you have any Bob Peare switches on your layout? I would like to see a photo if you do. Thanks.

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 11:16 pm
by ScaleCraft
I don't think so. Couple of Ross, couple of ROW, and on the railroad or on a shelf 75 GarGraves of at least 4 or 5 variations, back to fairly sharp all wood units.

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 11:28 pm
by rogruth
Dave,
I'm glad this is MTJ and not some other forum where we would be seeing comments about thread drift instead of comments about a nice layout to be.
:wink: :wink: :roll: :roll: :) :)

Re: Northern Pacific progress

Posted: Tue Oct 02, 2018 11:52 pm
by ScaleCraft
I almost didn't post these. 6-1/2 years ago I started the thread here on MTJ of the rebuild of the moribund NP in the basement...then the first great purge...and it was all gone.
Remember this, when I dug back into the old engine terminal?
Image

Re: Northern Pacific progress

Posted: Wed Oct 03, 2018 5:58 am
by 2railjon
Yikes! :shock:

Re: Northern Pacific progress

Posted: Wed Oct 03, 2018 1:00 pm
by ScaleCraft
short story....32 years ago built the basement line. 16X14 basement..
Then 24 years ago, started the outdoor railroad, elevated, needed dirt....needed storage for the new business......took a basement wall out and carried dirt out, two 5-gallon buckets at a time..then re-poured the walls, then floor.....and the three sides of the original line sat for 20 years until I stopped working, and decided to see what was under the boxes and dirt.
We picked up chunks of concrete from between the ties and in the scenery for a long, long time.....breaking out concrete walls is not neat.

That engine was in the corner under the filter inlet for the furnace, so all the dirt and dust went right over it.

I had already yanked the engine off the clean track in the foreground when I took that photo.

Re: Northern Pacific progress

Posted: Wed Oct 03, 2018 3:23 pm
by R.K. Maroon
Dave -- Great to see progress on the layout. I know you have 2-rail equipment as well as 3-rail. I don't remember for sure but I want to say you have some 2-rail track somewhere too or else some other provision to run your 2-rail models. Yes? No?

Jim

Re: Northern Pacific progress

Posted: Wed Oct 03, 2018 4:43 pm
by ScaleCraft
Yes...and no.

I have lots of 2-rail Tru-Scale, and switches, and crossovers, and Marn-0-Stats, and...TRAINS.

I had planed on 2-rail around the outside, but realized I am too old and limited in energy to do that, so working on just the three-rail instead.

That and the restored OLD H0, and the LS outside, and the old cars...keeps me more than busy.

Re: Northern Pacific progress

Posted: Fri Oct 05, 2018 7:18 pm
by ScaleCraft
Sixteen inches of track to put in. Marked to cut. After dinner.

Already ran an A-N SW in three-rail across the outer main (apparently I wired up one end and it works without jumpers...which will be installed).

Pennsy Block Walls glued in.

Upper branch sound stop laid, tack set in place, curve cut plywood for grade tested.

Re: Northern Pacific progress

Posted: Fri Oct 05, 2018 8:39 pm
by ScaleCraft
Image

A-N switcher on outer main...new block retaining wall installed. Both mains fully laid.

Image

Turntable lead from vantage point of pit. The closest switch is for the second track to the pit.

Image

The closest track on the left is going to the pit.

Image

From the liftout. Double tracked main with branchline on right, fanning into yard throat. Track all the way on the left is turntable lead.

Image

Block retaining wall...mine branch on top, switch at far end, plywood curve to check fit.

Image

Retaining wall from other end.

Image

A little deeper into the yard throat.