Page 1 of 1
Raised the bridge to accommodate the larger engines
Posted: Mon Jul 12, 2021 10:09 am
by philo426
Worked out well.

Re: Raised the bridge to accommodate the larger engines
Posted: Mon Jul 12, 2021 10:50 pm
by gregj410
What am I missing here?
Re: Raised the bridge to accommodate the larger engines
Posted: Tue Jul 13, 2021 2:50 am
by philo426
When I first built it,the brudge was not high enough to accommodate some of my larger engines so I raised it 2 inches.
Re: Raised the bridge to accommodate the larger engines
Posted: Tue Jul 13, 2021 9:16 am
by Rufus T. Firefly
philo426 wrote:When I first built it,the brudge was not high enough to accommodate some of my larger engines so I raised it 2 inches.
That's what it looks like to me - opened up that blue bit at the bottom and tacked on 2" under it.
Re: Raised the bridge to accommodate the larger engines
Posted: Tue Jul 13, 2021 1:04 pm
by philo426
Yes
Re: Raised the bridge to accommodate the larger engines
Posted: Tue Jul 13, 2021 7:14 pm
by philo426
Bridge extension is assembled and painted.I will let it cure overnight before joining the sections together.

Re: Raised the bridge to accommodate the larger engines
Posted: Wed Jul 14, 2021 2:58 pm
by philo426
Bridge installed and I went with led lighting.
