Now we have that idiotic scanner un-nutted (dam router; so convenient with no wires...)
So lets see a Lib in a graving dock.
First a quick tutorial. This dock was active at Bethlehem Steel's Sparrows Point shipyard and might still be for all I know now. It was just down the hill from Beth Steel's mill and rolling plant and Beth did their shipwork here.
BTW, the ship itself is a Beth Steel product built at Beth-Fairfield in Baltimore. It's an early rivetted-hull Lib, not a welded Kaiser ship. It was converted as a troop carrier during WWII and spent most of its wartime carrier under States Marine's colours, supplying the Sicily, Italian, and Southern France campaigns. It eventually became a maritime high school in New York City before it was 'rescued" out of the MARAD reserve fleet in the James River and brought to Baltimore for restoration as a museum ship.
Back to the graving dock, these are huge fixed facilities and work pretty much like a lock. close the doors out front and pump it dry; open the taps to refloat then open the doors. First, the dock has to be drained and the blocks crane-set or forklifted by the diagram that is part of the paperwork of the ship. Then after a datum fore-and-aft and a second side-to-side is taken, the dock is flooded and the ship brought in.
The ship gets positioned to the data by winch and the dock is drained with position checked pretty carefully. Meanwhile, the ship itself is taken dead (all internal power shut down including the plant) and many cables are brought over and plugged up to supply the ship with external power.
Here are a couple views of the blocking. The keel run is, I believe, left in place no matter the ship. There might be one or two shifted about in special requirements of the blocking diagram, but the general arrangement of the run goes full length of the occupied part of the dock.

It's fun to be able to say you walked under a 10,000 ton ship (and that's not a large ship by the way except when its over your head- Grin), but you can see the outrigging block arrangement.
Here's the interesting end. These are single screw ships with a 16' (if I remember correctly) bronze wheel. The offsets in the rudder are to compensate for the flow off the wheel. The rectangular things are "zincs" strap-welded in place. They serve as a sacrificial anode and slowly dissolve instead of the bronze wheel or steel hull immersed in salt water with an electrical field to it. Those are new ones in place and the red-lead undercoat renewed.

This crappy photo is me, shown as a matter of scale. Dock time is bloody expensive so work proceeded on a 24 hour basis. I alternated nights with another guy and the Chief Engineer did day-shifts, so I'd go to my day-job, drive to the dock after and stay on board, go back to my day job, then go go home, cop a kip, and do it all again. This time round was a three week docking with a fair amount of rivet-work being done, and in November. Cold misty nights next to the water. My first full day home was Thanksgiving and I slept the whole dam day.

Here's what greeted me every other night. I'll always remember one walk-about down in the well on a particularly misty night as sparks fell from two welding crews and rivets were being tossed and suddenly Beth's electric furnace up the hill made a pour which just lit up the mist. I've seen Dante's Inferno!

Here's a day-view. You might wonder how we got paint on the parts where the blocks are. That is an exercise we called fleeting the ship. There are actually two arrangements of blocks in the blocking diagram. If you're lucky, the fleet only means you partially flood the dock and shift the ship up or down the same arrangement of blocks to clear the covered bits. At worst, you flood, move the ship, and rearrange the blocks after draining, reflood, and bring the ship back on the new arrangement.
Nothing goes fast doing this.