Just another attempt to keep the conversation going

Discuss All Facets of 2-Rail, 1/48 Scale, Model Railroading
User avatar
RDSRR
Posts: 932
Joined: Fri Aug 14, 2009 11:06 pm

Re: Just another attempt to keep the conversation going

Postby RDSRR » Tue Jun 27, 2017 9:48 am

I'm playing with frogs. Finally replacing the frogs in the few Old Pullman switches I have before I started to build my own. Thanks Jay!

Image
Regards,

Dan

The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/

bob turner
Posts: 13676
Joined: Sat Jan 13, 2007 7:57 pm

Re: Just another attempt to keep the conversation going

Postby bob turner » Tue Jun 27, 2017 2:46 pm

Aren't those nice? Half my switches have them, but alas I have not re-ballasted the "new" loops. I have put it off for two decades.b If I ever get a scanner, I will show you the old ballasted and scenicked loops.

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Just another attempt to keep the conversation going

Postby ScaleCraft » Tue Jun 27, 2017 9:22 pm

RDSRR wrote:I'm playing with frogs. Finally replacing the frogs in the few Old Pullman switches I have before I started to build my own. Thanks Jay!

Image

Just a question. Why is the old frog chopped up so much? On the far end (left) there is even a very short piece of rail on each leg.
Not pickin', just askin'.
There had to have been a reason.
I just ripped an old yard section fully apart, and some switches used separate points, some bending rail, all joints of rail (with joiners) soldered...and the rails were cut for insulation two to three inches from a soldered joiner, and there must have been a reason for that, too.
Dave....gone by invitation

E7
Posts: 8404
Joined: Wed Dec 12, 2007 1:35 am

Re: Just another attempt to keep the conversation going

Postby E7 » Tue Jun 27, 2017 9:50 pm

Robert wrote:I'm busy building a Fairmont Speeder from an old Period Miniatures kit I found on eBay about ten years ago. It is a white metal kit and small enough to test my eyes and fingers and modeling ability to the max. But the final product will be quite appealing. Robert


Please post some pics when it is finished!

Rich

User avatar
RDSRR
Posts: 932
Joined: Fri Aug 14, 2009 11:06 pm

Re: Just another attempt to keep the conversation going

Postby RDSRR » Tue Jun 27, 2017 10:49 pm

ScaleCraft wrote:Just a question. Why is the old frog chopped up so much? On the far end (left) there is even a very short piece of rail on each leg.
Not pickin', just askin'.
There had to have been a reason.


Because I was an idiot back in the day :oops: I had problems before with power routing and butchered it. I did the original cut way to close (and wide) and had problems and went back recut. Lesson learned.
Regards,

Dan

The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Just another attempt to keep the conversation going

Postby ScaleCraft » Tue Jun 27, 2017 11:07 pm

I figured there was a reason. Thanks.
Dave....gone by invitation

Jay Criswell
Posts: 2004
Joined: Thu Mar 06, 2008 12:38 pm

Re: Just another attempt to keep the conversation going

Postby Jay Criswell » Tue Jun 27, 2017 11:24 pm

Sure glad I never screw up (well, at least I don't photograph the proof)! :D

Dan, please show us how it looks after you've replaced that custom frog.

Jay

up148
Posts: 4796
Joined: Sat Nov 01, 2008 11:52 am

Re: Just another attempt to keep the conversation going

Postby up148 » Wed Jun 28, 2017 4:08 pm

ScaleCraft wrote:
RDSRR wrote:I'm playing with frogs. Finally replacing the frogs in the few Old Pullman switches I have before I started to build my own. Thanks Jay!

Image

Just a question. Why is the old frog chopped up so much? On the far end (left) there is even a very short piece of rail on each leg.
Not pickin', just askin'.
There had to have been a reason.
I just ripped an old yard section fully apart, and some switches used separate points, some bending rail, all joints of rail (with joiners) soldered...and the rails were cut for insulation two to three inches from a soldered joiner, and there must have been a reason for that, too.



Wow! It looks better with just the new frog sitting there. :) :) :) Please do show us the after photo. I had some HO handlaid turnouts that looked like that. :shock: :shock: :shock: except in HO the trains wouldn't even run through it without derailing.

Robert
Posts: 1051
Joined: Sat Dec 11, 2010 3:00 pm

Re: Just another attempt to keep the conversation going

Postby Robert » Wed Jun 28, 2017 6:25 pm

E7 wrote:
Robert wrote:I'm busy building a Fairmont Speeder from an old Period Miniatures kit I found on eBay about ten years ago. It is a white metal kit and small enough to test my eyes and fingers and modeling ability to the max. But the final product will be quite appealing. Robert


Please post some pics when it is finished!

Rich


Sure thing, here goes...

Pennsy Speeder & Trailer (1).jpg

Pennsy Speeder & Trailer (2).jpg

Pennsy Speeder & Trailer (3).jpg

Pennsy Speeder & Trailer (4).jpg

Pennsy Speeder & Trailer (5).jpg

Pennsy Speeder & Trailer (6).jpg

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Just another attempt to keep the conversation going

Postby ScaleCraft » Wed Jun 28, 2017 6:51 pm

I have built and rebuilt more switches than I care to remember anymore.
In #1 gauge, usually used out of doors. I have close to 100 on the outdoor railroad (never get the same numbers when I count them), plus dozens spare.
These were mostly built near Morgan Hill in California. Originally wood ties with Fiberglas stringers...of which one would shrink and pull the switch into a reverse curve..and ties would rot...so you ordered out the new UV stabilized nylon or plastic ties, new spikes, and started in...usually regauged as you went to fix them.
Damaged ones, home built ones with cedar ties that rotted (and steel spikes that disappeared). New spikes are blackened stainless, pre-drill (smaller), drive them in, bend the tips over into the void provided (a bit over 1/8"), set the spike heads into a vise, and peen the ends down with a small hammer and drift.
A bit different.
Some of the frogs are silver brazed and made up, some are cast.
With the rails of 215 or 250 aluminum.
Wait unto a customer brings one to you he had laid on the ground and ran over it with his rotary lawnmower.
Dave....gone by invitation

User avatar
RDSRR
Posts: 932
Joined: Fri Aug 14, 2009 11:06 pm

Re: Just another attempt to keep the conversation going

Postby RDSRR » Wed Jun 28, 2017 8:43 pm

Getting closer with this one. Waiting for the ACC to to dry so I can trim the insulators.

Image
Image
Regards,

Dan

The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/

Jay Criswell
Posts: 2004
Joined: Thu Mar 06, 2008 12:38 pm

Re: Just another attempt to keep the conversation going

Postby Jay Criswell » Wed Jun 28, 2017 9:14 pm

Too shiny & clean! :mrgreen:

bob turner
Posts: 13676
Joined: Sat Jan 13, 2007 7:57 pm

Re: Just another attempt to keep the conversation going

Postby bob turner » Wed Jun 28, 2017 10:21 pm

Pretend the track crew just installed it. Really nice track. Won't be long before you are headed to Proto-48.

User avatar
RDSRR
Posts: 932
Joined: Fri Aug 14, 2009 11:06 pm

Re: Just another attempt to keep the conversation going

Postby RDSRR » Wed Jun 28, 2017 10:27 pm

Jay Criswell wrote:Too shiny & clean! :mrgreen:


Maybe you could take it easy on the track crew and sell them dirty. :mrgreen:
Regards,

Dan

The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/

User avatar
RDSRR
Posts: 932
Joined: Fri Aug 14, 2009 11:06 pm

Re: Just another attempt to keep the conversation going

Postby RDSRR » Wed Jun 28, 2017 10:29 pm

Robert wrote:Sure thing, here goes...


Love the speeder. I have one still in a box. Great pix, it will help me from screwing up :D
Regards,

Dan

The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/


Return to “O-Gauge, 2-Rail, Model Railroading”

Who is online

Users browsing this forum: No registered users and 77 guests