I'm playing with frogs. Finally replacing the frogs in the few Old Pullman switches I have before I started to build my own. Thanks Jay!


Regards,
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
-
bob turner
- Posts: 13676
- Joined: Sat Jan 13, 2007 7:57 pm
Re: Just another attempt to keep the conversation going
Aren't those nice? Half my switches have them, but alas I have not re-ballasted the "new" loops. I have put it off for two decades.b If I ever get a scanner, I will show you the old ballasted and scenicked loops.
- ScaleCraft
- Posts: 6693
- Joined: Thu Jan 26, 2012 10:15 pm
Re: Just another attempt to keep the conversation going
RDSRR wrote:I'm playing with frogs. Finally replacing the frogs in the few Old Pullman switches I have before I started to build my own. Thanks Jay!
Just a question. Why is the old frog chopped up so much? On the far end (left) there is even a very short piece of rail on each leg.
Not pickin', just askin'.
There had to have been a reason.
I just ripped an old yard section fully apart, and some switches used separate points, some bending rail, all joints of rail (with joiners) soldered...and the rails were cut for insulation two to three inches from a soldered joiner, and there must have been a reason for that, too.
Dave....gone by invitation
Re: Just another attempt to keep the conversation going
Robert wrote:I'm busy building a Fairmont Speeder from an old Period Miniatures kit I found on eBay about ten years ago. It is a white metal kit and small enough to test my eyes and fingers and modeling ability to the max. But the final product will be quite appealing. Robert
Please post some pics when it is finished!
Rich
Re: Just another attempt to keep the conversation going
ScaleCraft wrote:Just a question. Why is the old frog chopped up so much? On the far end (left) there is even a very short piece of rail on each leg.
Not pickin', just askin'.
There had to have been a reason.
Because I was an idiot back in the day
Regards,
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
- ScaleCraft
- Posts: 6693
- Joined: Thu Jan 26, 2012 10:15 pm
Re: Just another attempt to keep the conversation going
I figured there was a reason. Thanks.
Dave....gone by invitation
-
Jay Criswell
- Posts: 2004
- Joined: Thu Mar 06, 2008 12:38 pm
Re: Just another attempt to keep the conversation going
Sure glad I never screw up (well, at least I don't photograph the proof)!
Dan, please show us how it looks after you've replaced that custom frog.
Jay
Dan, please show us how it looks after you've replaced that custom frog.
Jay
Re: Just another attempt to keep the conversation going
ScaleCraft wrote:RDSRR wrote:I'm playing with frogs. Finally replacing the frogs in the few Old Pullman switches I have before I started to build my own. Thanks Jay!
Just a question. Why is the old frog chopped up so much? On the far end (left) there is even a very short piece of rail on each leg.
Not pickin', just askin'.
There had to have been a reason.
I just ripped an old yard section fully apart, and some switches used separate points, some bending rail, all joints of rail (with joiners) soldered...and the rails were cut for insulation two to three inches from a soldered joiner, and there must have been a reason for that, too.
Wow! It looks better with just the new frog sitting there.
Re: Just another attempt to keep the conversation going
E7 wrote:Robert wrote:I'm busy building a Fairmont Speeder from an old Period Miniatures kit I found on eBay about ten years ago. It is a white metal kit and small enough to test my eyes and fingers and modeling ability to the max. But the final product will be quite appealing. Robert
Please post some pics when it is finished!
Rich
Sure thing, here goes...
- ScaleCraft
- Posts: 6693
- Joined: Thu Jan 26, 2012 10:15 pm
Re: Just another attempt to keep the conversation going
I have built and rebuilt more switches than I care to remember anymore.
In #1 gauge, usually used out of doors. I have close to 100 on the outdoor railroad (never get the same numbers when I count them), plus dozens spare.
These were mostly built near Morgan Hill in California. Originally wood ties with Fiberglas stringers...of which one would shrink and pull the switch into a reverse curve..and ties would rot...so you ordered out the new UV stabilized nylon or plastic ties, new spikes, and started in...usually regauged as you went to fix them.
Damaged ones, home built ones with cedar ties that rotted (and steel spikes that disappeared). New spikes are blackened stainless, pre-drill (smaller), drive them in, bend the tips over into the void provided (a bit over 1/8"), set the spike heads into a vise, and peen the ends down with a small hammer and drift.
A bit different.
Some of the frogs are silver brazed and made up, some are cast.
With the rails of 215 or 250 aluminum.
Wait unto a customer brings one to you he had laid on the ground and ran over it with his rotary lawnmower.
In #1 gauge, usually used out of doors. I have close to 100 on the outdoor railroad (never get the same numbers when I count them), plus dozens spare.
These were mostly built near Morgan Hill in California. Originally wood ties with Fiberglas stringers...of which one would shrink and pull the switch into a reverse curve..and ties would rot...so you ordered out the new UV stabilized nylon or plastic ties, new spikes, and started in...usually regauged as you went to fix them.
Damaged ones, home built ones with cedar ties that rotted (and steel spikes that disappeared). New spikes are blackened stainless, pre-drill (smaller), drive them in, bend the tips over into the void provided (a bit over 1/8"), set the spike heads into a vise, and peen the ends down with a small hammer and drift.
A bit different.
Some of the frogs are silver brazed and made up, some are cast.
With the rails of 215 or 250 aluminum.
Wait unto a customer brings one to you he had laid on the ground and ran over it with his rotary lawnmower.
Dave....gone by invitation
Re: Just another attempt to keep the conversation going
Getting closer with this one. Waiting for the ACC to to dry so I can trim the insulators.




Regards,
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
-
Jay Criswell
- Posts: 2004
- Joined: Thu Mar 06, 2008 12:38 pm
Re: Just another attempt to keep the conversation going
Too shiny & clean! 
-
bob turner
- Posts: 13676
- Joined: Sat Jan 13, 2007 7:57 pm
Re: Just another attempt to keep the conversation going
Pretend the track crew just installed it. Really nice track. Won't be long before you are headed to Proto-48.
Re: Just another attempt to keep the conversation going
Jay Criswell wrote:Too shiny & clean!
Maybe you could take it easy on the track crew and sell them dirty.
Regards,
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
Re: Just another attempt to keep the conversation going
Robert wrote:Sure thing, here goes...
Love the speeder. I have one still in a box. Great pix, it will help me from screwing up
Regards,
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
Dan
The Model Railroad Resource LLC
407 East Chippewa St - Dwight, IL 60420
Voice 815.584.1577 / FAX 800.783.0127
daniel@modelrailroadresource.com / http://modelrailroadresource.com
http://oscaleresource.com/ and http://sscaleresource.com/
Return to “O-Gauge, 2-Rail, Model Railroading”
Who is online
Users browsing this forum: No registered users and 78 guests