Northern Pacific progress

Discuss All Facets of 2-Rail, 1/48 Scale, Model Railroading
User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Northern Pacific progress

Postby ScaleCraft » Tue Oct 02, 2018 6:56 pm

Image
Image
Image
Image
Image
Image

Finally yard is in. Switches, track, all screwed down, gaps, no power yet.
Alligator leads for testing.
Actually have a caboose track for the first time ever.
Outer main is not quite done, the last curve is bent, but two switches are set but not installed for accessing engine terminal off main....the 3/4 base has been raised for that area 1/4" and now matches...so close to putting the pit in.

One rubbing contact on the main shaft for three rail power.
Dave....gone by invitation

User avatar
rogruth
Posts: 24452
Joined: Sun Aug 14, 2005 8:32 pm
Location: pembroke,ga

Re: Northern Pacific progress

Postby rogruth » Tue Oct 02, 2018 7:36 pm

Dave,
Good to see moe of your 3R layout. It has been a while. More please.
roger

I support thread drift.
If God didn't want women to be looked at, He would have made 'em ugly. RAH

E7
Posts: 8404
Joined: Wed Dec 12, 2007 1:35 am

Re: Northern Pacific progress

Postby E7 » Tue Oct 02, 2018 8:50 pm

Dave,

Lookin' good!

Rich

User avatar
De Bruin
Posts: 991
Joined: Thu Jan 12, 2017 8:24 pm

Re: Northern Pacific progress

Postby De Bruin » Tue Oct 02, 2018 9:03 pm

Agree, looks great Dave
You gotta love Gargraves, though it sure is a pain to cut.
I think I still have the scars
Political Consultant- Tap into the hidden powers of your public office, insure your future is jail free, well funded. Visit shock and awe upon your adversaries, dominate the media, thrill your followers. contact morbo@happydaysrhereagain.com

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Northern Pacific progress

Postby ScaleCraft » Tue Oct 02, 2018 10:51 pm

Pain to cut...sometimes. If I have four inches to whack, tin snips to 1/4"-3/8" then Dremel cutoff wheel to finish.

I am replacing really old..rusty...bad stuff, at least third relay...with this nice stuff I took from Bill's pike for old, plus all the new stuff like this yard.

And, I ain't as nimble as I used to be...takes time.
Dave....gone by invitation

Nortonville Phil
Posts: 223
Joined: Sat Jul 31, 2010 11:05 pm
Location: Red Oak TX
Contact:

Re: Northern Pacific progress

Postby Nortonville Phil » Tue Oct 02, 2018 11:00 pm

Nice layout Dave. Say do you have any Bob Peare switches on your layout? I would like to see a photo if you do. Thanks.
Trinity Valley Traction Co.
Texas Midland Railroad
Homewood Shops
Red Oak, TX

My traction blog: Bluebonnet Limited
http://bluebonnetlimited.blogspot.com/

Homewood Shops YouTube:
https://youtube.com/@cug6?si=BCFnDDtUw2eVKamo

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Northern Pacific progress

Postby ScaleCraft » Tue Oct 02, 2018 11:16 pm

I don't think so. Couple of Ross, couple of ROW, and on the railroad or on a shelf 75 GarGraves of at least 4 or 5 variations, back to fairly sharp all wood units.
Dave....gone by invitation

User avatar
rogruth
Posts: 24452
Joined: Sun Aug 14, 2005 8:32 pm
Location: pembroke,ga

Re: Northern Pacific progress

Postby rogruth » Tue Oct 02, 2018 11:28 pm

Dave,
I'm glad this is MTJ and not some other forum where we would be seeing comments about thread drift instead of comments about a nice layout to be.
:wink: :wink: :roll: :roll: :) :)
roger

I support thread drift.
If God didn't want women to be looked at, He would have made 'em ugly. RAH

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Northern Pacific progress

Postby ScaleCraft » Tue Oct 02, 2018 11:52 pm

I almost didn't post these. 6-1/2 years ago I started the thread here on MTJ of the rebuild of the moribund NP in the basement...then the first great purge...and it was all gone.
Remember this, when I dug back into the old engine terminal?
Image
Dave....gone by invitation

User avatar
2railjon
Posts: 15906
Joined: Fri Apr 02, 2004 2:33 pm

Re: Northern Pacific progress

Postby 2railjon » Wed Oct 03, 2018 5:58 am

Yikes! :shock:
Running that red block Charlie.

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Northern Pacific progress

Postby ScaleCraft » Wed Oct 03, 2018 1:00 pm

short story....32 years ago built the basement line. 16X14 basement..
Then 24 years ago, started the outdoor railroad, elevated, needed dirt....needed storage for the new business......took a basement wall out and carried dirt out, two 5-gallon buckets at a time..then re-poured the walls, then floor.....and the three sides of the original line sat for 20 years until I stopped working, and decided to see what was under the boxes and dirt.
We picked up chunks of concrete from between the ties and in the scenery for a long, long time.....breaking out concrete walls is not neat.

That engine was in the corner under the filter inlet for the furnace, so all the dirt and dust went right over it.

I had already yanked the engine off the clean track in the foreground when I took that photo.
Dave....gone by invitation

User avatar
R.K. Maroon
Posts: 3140
Joined: Tue Feb 22, 2011 9:20 pm

Re: Northern Pacific progress

Postby R.K. Maroon » Wed Oct 03, 2018 3:23 pm

Dave -- Great to see progress on the layout. I know you have 2-rail equipment as well as 3-rail. I don't remember for sure but I want to say you have some 2-rail track somewhere too or else some other provision to run your 2-rail models. Yes? No?

Jim
The link below any photo will display the image full size

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Northern Pacific progress

Postby ScaleCraft » Wed Oct 03, 2018 4:43 pm

Yes...and no.

I have lots of 2-rail Tru-Scale, and switches, and crossovers, and Marn-0-Stats, and...TRAINS.

I had planed on 2-rail around the outside, but realized I am too old and limited in energy to do that, so working on just the three-rail instead.

That and the restored OLD H0, and the LS outside, and the old cars...keeps me more than busy.
Dave....gone by invitation

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Northern Pacific progress

Postby ScaleCraft » Fri Oct 05, 2018 7:18 pm

Sixteen inches of track to put in. Marked to cut. After dinner.

Already ran an A-N SW in three-rail across the outer main (apparently I wired up one end and it works without jumpers...which will be installed).

Pennsy Block Walls glued in.

Upper branch sound stop laid, tack set in place, curve cut plywood for grade tested.
Dave....gone by invitation

User avatar
ScaleCraft
Posts: 6693
Joined: Thu Jan 26, 2012 10:15 pm

Re: Northern Pacific progress

Postby ScaleCraft » Fri Oct 05, 2018 8:39 pm

Image

A-N switcher on outer main...new block retaining wall installed. Both mains fully laid.

Image

Turntable lead from vantage point of pit. The closest switch is for the second track to the pit.

Image

The closest track on the left is going to the pit.

Image

From the liftout. Double tracked main with branchline on right, fanning into yard throat. Track all the way on the left is turntable lead.

Image

Block retaining wall...mine branch on top, switch at far end, plywood curve to check fit.

Image

Retaining wall from other end.

Image

A little deeper into the yard throat.
Dave....gone by invitation


Return to “O-Gauge, 2-Rail, Model Railroading”

Who is online

Users browsing this forum: No registered users and 56 guests