That is why THIS layout will come apart easily. Ballast, loose. Shopvac.
Track screwed down....not glued down. Switches screwed down. Groundthrows screwed down.
No nails in the benchwork (or even slot-head screws like one I tore down).
Trackwork
- ScaleCraft
- Posts: 6693
- Joined: Thu Jan 26, 2012 10:15 pm
Re: Trackwork
Dave....gone by invitation
- ScaleCraft
- Posts: 6693
- Joined: Thu Jan 26, 2012 10:15 pm
Re: Trackwork
J. S. Bach wrote:Well, if you ever want to get rid of the Quonset hut.................. Seriously, I eagerly await the photos.
https://korbermodels.com/collections/o-scale?page=3
Kit 706.
Not the straight sided one shown, but a round-roof-to-the-ground unit. Buy two or three! Kit bash!
Dave....gone by invitation
- Rufus T. Firefly
- Posts: 42229
- Joined: Wed May 16, 2007 7:52 am
- Location: To be Determined
Re: Trackwork
ScaleCraft wrote:No nails in the benchwork (or even slot-head screws like one I tore down).
So what holds the benchwork together? No nails, no screws.....friction and gravity? Dovetails?
Last edited by Rufus T. Firefly on Sat Nov 24, 2018 6:11 pm, edited 1 time in total.
What doesn’t kill you makes you stronger. It also gives you a lot of unhealthy coping mechanisms, trust issues, and a dark sense of humor.
- ScaleCraft
- Posts: 6693
- Joined: Thu Jan 26, 2012 10:15 pm
Re: Trackwork
Rufus T. Firefly wrote:ScaleCraft wrote:No nails in the benchwork (or even slot-head screws like one I tore down).
So what holds the benchwork together? No nails, no screws.....friction and gravity?
Ah, read and understand, padawan.
No Nails. No slot-head screws.
Does not eliminate Phillips head screws.
Slot head...geez. Joe (Mensa, no less) did all 3/4 ply benchwork, including "L" cross section legs...and slot head screws. Probably thousands of the buggers.
SOMEbody robbed every tool out of the place before we tore it down....but, in the bottom of a drawer of junk was a cut off slot head screwdriver that fit up in the old Makita drill chuck.
Good thing about him being an anal-retentive Mensa, is the screws straight down through the top sheet of 3/4 ply into the 3/4 ply side sheets...and covered with scenery...were all spaced exactly the same distance apart on all the module sections so we didn't have to chisel out 8 feet of plaster to find the screw heads.
Dave....gone by invitation
- Rufus T. Firefly
- Posts: 42229
- Joined: Wed May 16, 2007 7:52 am
- Location: To be Determined
Re: Trackwork
ScaleCraft wrote:Rufus T. Firefly wrote:ScaleCraft wrote:No nails in the benchwork (or even slot-head screws like one I tore down).
So what holds the benchwork together? No nails, no screws.....friction and gravity?
Ah, read and understand, padawan.
No Nails. No slot-head screws.
Does not eliminate Phillips head screws.
Or a host of other types of screws - I was reading that as your disdain of screws in general. I figured you used blind dovetail joints,
Slot head...geez. Joe (Mensa, no less) did all 3/4 ply benchwork, including "L" cross section legs...and slot head screws. Probably thousands of the buggers.
Probably got a good deal on a case of them - beats dealing with glue dipped nails - yes, I've had the joy of dealing with a layout assembled using them. Crowbars, striking hammer, and sawzall....
What doesn’t kill you makes you stronger. It also gives you a lot of unhealthy coping mechanisms, trust issues, and a dark sense of humor.
Return to “O-Gauge, 2-Rail, Model Railroading”
Who is online
Users browsing this forum: No registered users and 41 guests