





Finally yard is in. Switches, track, all screwed down, gaps, no power yet.
Alligator leads for testing.
Actually have a caboose track for the first time ever.
Outer main is not quite done, the last curve is bent, but two switches are set but not installed for accessing engine terminal off main....the 3/4 base has been raised for that area 1/4" and now matches...so close to putting the pit in.
One rubbing contact on the main shaft for three rail power.








